Maccabi London
Project background:
ATB were asked to undertake a full assessment of the main stadium pitch at Maccabi sports ground after the drainage appeared to be failing. We implemented a feasibility study and site survey and found that the existing drainage had been damaged during the installation of new irrigation by another contractor six months previously. Rendering the entire primary drainage useless.
ATB then undertook a package of works that included removing the pitch vegetation, installing a new primary and secondary drainage system and resurfacing the pitch by ameliorating 25mm of sand into the surface before grading and seeding.
Key Works:
- Feasibility study and site assessments with detailed reports and surveys
- Design and build project that included installation of new primary and secondary drainage system
- Sand importation and amelioration to improve the pitch rootzone.
- Annual renovation services/packages going forward